Threshold Checks (10 person target):
Acres: unknown
Bedrooms: unknown
Water: not evaluated
Deal-breaker criteria failed.
Property Appeal
3
—
Living environment quality
Overall quality of life at this property. Consider: views, natural features, wildlife, peace/quiet, air quality, recreation opportunities.
—
Accommodation quality
Quality and comfort of existing living spaces. House condition, layout, comfort, guest accommodation potential.
—
Story & mission alignment
How well does this property tell the CVTas story? Visitor appeal, media potential, narrative fit with project goals. Includes unique/heritage features that add to the story.
Property Location & Access
2
—
Road access quality
Quality and reliability of road access. Consider: sealed vs unsealed, flood risk, winter accessibility, multiple access routes.
—
Distance to nearest town
Distance to nearest town with basic services (groceries, fuel, medical).
Property Risk & Resilience
3
—
Bushfire risk rating
Bushfire attack level/risk rating. Based on BAL assessment, fuel loads, defensible space potential.
—
Flood risk
Property flood risk level. Check flood maps and history.
—
Climate resilience
Adaptation potential to climate change. Consider: projected rainfall changes, temperature trends, water security under scenarios.
Property Water & Climate
3
—
Microclimate vs regional norm
How does the site's microclimate compare to the regional average?
—
Annual rainfall
Average annual rainfall in millimeters. Higher is better for water security.
—
Water storage potential
Potential for dams, ponds, tanks, and other water storage. Consider: dam sites, catchment area, existing infrastructure.
Property Security
4
—
Access control
Single/limited entry points, gateable, monitorable access. Consider: number of entrances, gate potential, approach visibility.
—
Obscurity
Low visibility from public roads, requires local knowledge to find, not obvious or easy to stumble upon.
Percentage of land usable for agriculture and buildings. Excludes: steep slopes, wetlands, rocky areas, dense bush.
—
Scalability for expansion
Can the site support phased growth without major rework? Consider: room for new buildings, infrastructure capacity, predictable marginal labor for new residents.
—
Maintenance burden estimate
Estimated ongoing labor for property maintenance. Consider: land management, fencing, access roads, clearing. 1=Very high labor, 10=Minimal ongoing work.
Property Infrastructure
5
—
Grid power available
Whether grid power is connected to the property.
—
Off-grid upgrade feasibility
Potential for renewable energy self-sufficiency. Consider: solar exposure, wind, hydro opportunities.
—
Existing buildings condition
Condition of existing buildings. Consider: structural integrity, weatherproofing, usability without major renovation.
—
Internet/communications status
Current internet and communications infrastructure.
—
Planning & permitting ease
Zoning compatibility and development pathway. Consider: current zoning, council attitudes, permit complexity, septic feasibility, subdivision potential.